City of Malden PLUS

Open Issues: 1.372 Temas cerrados: 93.192 Temas Reconocidos: 555
  • 111 Linden Avenue Malden, MA, 02148, USA - Malden Ward 4
    Missing cushions that go around the poles holding up the hoops.
  • Waite St Ext Malden, Massachusetts, 02148 - Malden Ward 6
    We need bigger street sign on Waite st and Waite st extention .
    And better position of the pole supporting the signs !
    Regards
  • Blomerth St Malden, Massachusetts, 02148 - Malden Ward 3

    This is a repeat of the concern addressed by a neighbor in Issue #16619259. The reply given by the Engineering Department did not address what is *really* happening on our street. They simply described what is *supposed* to happen, then closed the report. This does not help the residents impacted by this construction in any way.

    The Engineering Department Stated:
    "The typical practice for the construction of new concrete driveways is for the Contractor to excavate the old driveway and backfill with gravel so that it is passable until they are ready to form the driveway for the new concrete. Once they are ready to form they will remove the gravel starting the driveway closure. They then pour the new concrete the following day. On the third day they place the first layer of asphalt which allows the driveway to be open again."

    Well, if that were really happening, we'd have no reason to file a report. Here's what's ACTUALLY happening:

    The construction crew removes the concrete and a section of the driveway, leaving a large, impassable trench for several days, with NO GRAVEL, no asphalt, etc.., for up to 6 days in some cases. I have watched several of my neighbors lose access to their driveways for up to a week before any gravel or asphalt patch was put down to make the driveway usable.

    One of my neighbors even got desperate enough to take matters into his own hands, and used his own wheelbarrow and shovel to take gravel from the huge pile that the contractor left in the street, and fill in his own driveway so that he could use it. Why are residents forced to do the contractor's job that the City is paying for so that we can use our driveways?????

    We were told at the start of this project that we may lose access to our driveways for 72 hours. Please work with the contractor to ensure that they are completing the work in the manner that the Engineering Department described.

  • OtherAbierto
    End Of Lowell St Malden, Massachusetts - Malden Ward 1
    plow on a pickup truck sticks out makes it hard to pass while driving also Dangerous black pickup truck
  • 19 Linwood Street Malden, Massachusetts, 02148 - Malden Ward 7
    Authorized replacement sticker for improper placement.
    William
    815-954-7599
    19 Linwood St Apt 1
    Malden, MA 02148
  • 30 Wheeler Street Malden, MA, 02148, USA - Malden Ward 8
    Resident accidentally placed sticker on the lid.