Thanks for the recent sidewalk repair on the corner of Davis & Eastern-West side. However, many residents on the block were wondering as to whether additional repairs were to be made on the street. Both sides of the street are in dire need of repair and children & the elderly have stumbled and fallen as a result. This one block of Davis is the only street in Linden/Ward 8 that has yet to be resurfaced with concrete (excluding Arch & Prentiss which both lack sidewalks entirely). Thank you!
4 Comments
City of Malden (Verified Official)
Closed Robert P. Knox Jr. (Director of Public Works) (Verified Official)
There is no other sidewalk work scheduled at this time on Davis Street. Full sidewalk construction is not a DPW job we do spot repairs like this one. A full sidewalk reconstruction would be a contracted job done by the bidding process with appropriate funding secured.
Thanks
Bob Knox Jr.
Director