说明
I waited for at least two weeks wanting to see if the contractor who was replacing the lead pipes in the streets to the homeowner area might do a better job at filling in the sidewalk. It has not been done. There is a big dip (not completely filled in) where they opened up the sidewalk. Can this be more leveled to meet the sidewalk. Afraid someone will lose balance while walking up and down this side of street.
7 评论s
Malden, MA (官方验证)
Robert P. Knox Jr. (Director of Public Works) (官方验证)
Malden, MA (官方验证)
Kay M (注册用户)
Kay M (注册用户)
关闭 Yem Lip (Director of Engineering) (官方验证)
Kay M (注册用户)