Descrição
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
A temporary asphalt patch was applied to the concrete sidewalk at least 6 years ago, and it is cracked and bumpy. The asphalt patch needs to be replaced with concrete that matches the rest of the sidewalk.
3 Comentários
Reconhecida DC 311 (Utilizador Registado)
JTH (Utilizador Registado)
Encerradas DC 311 (Utilizador Registado)